Request a demo
Construction managementComing soon

Schedules, daily reports, submittals and RFIs for the contractor, and quantities, pay estimates and acceptance for the owner and inspector.

Section through a bridge replacement project An engineering section of a two-span bridge over a channel, numbered by project stage: 1 survey and alignment, 2 borings and drilled shaft foundations, 3 girders, pier and abutments, 4 specification notes, 5 construction schedule, 6 material tests on the embankment fill and concrete, 7 inspection of bearings and girders. B-1 B-2 10+00 11+00 12+00 13+00 14+00 15+00 16+00 NOTES1. Drilled shafts: Section F-210.2. Bi-directional load test: Section F-430. SCHEDULE SECTION A-ABridge replacement, two spans Survey and alignment 1 Borings and foundations 2 Structure 3 Specifications 4 Construction schedule 5 Material tests 6 Inspection 7

Sitetechware modules

Schedules, daily reports, submittals and RFIs for the contractor, and quantities, pay estimates and acceptance for the owner and inspector. Open a module to see its scope and standards.

Construction

Project management

  • Schedule and ProgressCPM schedules, activities and milestonesComing soon

    Maintains CPM schedules with activities, logic, durations and milestones, and imports or exports schedule files. Records progress updates, computes critical path and float, and compares current dates with the baseline.

    Standards
    Primavera P6 XER, Microsoft Project XML, FDOT Standard Specifications for Road and Bridge Construction
    Uses
    Bid items and contract time
    Provides
    Schedule activities and progress updates
  • Daily Field ReportsInspector and contractor daily reportsComing soon

    Records daily inspector and contractor reports with weather, manpower, equipment, work performed, quantities and delays. Produces dated reports linked to pay items and schedule activities for the daily project diary.

    Standards
    FDOT Construction Project Administration Manual
    Uses
    Pay items, activities and inspection records
    Provides
    Daily reports and field quantities
  • Submittals and RFIsLogs, responses and review statusComing soon

    Logs submittals and requests for information with dates received and returned, responsible reviewer, responses and review status. Produces open item lists and response times for progress meetings and links each item to its specification section.

    Standards
    AIA A201 General Conditions of the Contract for Construction, EJCDC C-700 Standard General Conditions of the Construction Contract
    Uses
    Submittal register from specifications
    Provides
    Submittal and RFI logs
  • Closeout RecordsAs-built and project recordComing soon

    Collects as-built information, final quantities, test results and accepted submittals into the project record. Produces the closeout record set and the list of outstanding items required before final inspection and acceptance.

    Standards
    FDOT Construction Project Administration Manual
    Uses
    Closeout items, tests and final quantities
    Provides
    Project record and as-built set

Contract administration

  • Pay Items and QuantitiesQuantities placed against the bid itemsComing soon

    Records quantities placed against each bid item from field measurements and daily reports. Tracks placed quantities against bid quantities and holds each quantity until testing and inspection show it as accepted.

    Standards
    FDOT Standard Specifications for Road and Bridge Construction, FDOT Basis of Estimates Manual
    Uses
    Bid items, daily reports and acceptance
    Provides
    Placed quantities by pay item
  • Pay EstimatesPeriodic estimates from accepted quantitiesComing soon

    Computes periodic pay estimates from accepted quantities and unit prices, with retainage and previous payments. Produces estimate summaries by pay item, with amounts this period and to date, for contractor and owner review.

    Standards
    AIA G702 Application and Certificate for Payment, AIA G703 Continuation Sheet, FDOT Construction Project Administration Manual
    Uses
    Accepted quantities and unit prices
    Provides
    Pay estimates and payment totals
  • Change OrdersChanges, time extensions and supplemental agreementsComing soon

    Records changes to the contract with added or revised items, unit prices, amounts and time extensions. Produces change orders and supplemental agreements and updates the pay items and contract time.

    Standards
    FDOT Construction Project Administration Manual
    Uses
    Bid items, schedule and RFIs
    Provides
    Revised pay items and contract time

Monitoring

Site monitoring

  • Construction MonitoringSensor readings during constructionComing soon

    Records sensor readings taken during construction, such as vibration, settlement, tilt and groundwater levels. Compares readings with threshold values and produces time histories, summary tables and exceedance reports by instrument location.

    Standards
    No single governing document
    Uses
    Instrument locations and threshold values
    Provides
    Monitoring readings and exceedance reports
  • Remote MonitoringReal-time site data and alertsComing soon

    Receives site sensor data at set intervals from field data loggers and stores it by instrument. Displays current readings and trends, and sends alerts to the project team when readings exceed alert or action levels.

    Standards
    No single governing document
    Uses
    Instruments and alert levels
    Provides
    Logged readings and alert history

Questions about Sitetechware?