Platform
The tools every Techware product uses, and how work moves from one stage of a project to the next.
EasyImportBrings paper and PDF documents into the project, read automatically or traced by hand.BetaEasyReportReports, calculation packages and drawings from the analysis.Coming soonField appField forms for every product, on a phone or tablet, with or without a connection.Coming soonField devicesData acquisition and sensors that send field readings straight into the project.Coming soonAccess and approvalsEvery party on a project in one place, each with access to their part.Coming soon
Example: one drilled shaft, from survey to inspection
A bridge replacement, Pier 2. Each step is done in the product for that stage, and each starts from the work before it.
- Set the alignmentThe alignment, stations and existing ground surface come from the survey.
- Read the boringsEasyImport reads the boring logs: strata, SPT N values, laboratory results and groundwater.
- Take the loads downThe bridge loads are carried down to the pier and the factored shaft loads go to the foundation design.
- Design the shaftThe shaft length and diameter are designed from the borings and the pier loads, and the load test is laid out.
- Write the sectionsThe drilled shaft and load test sections are written from the design: test load, gauge levels and acceptance criteria.
- Record constructionInstallation, concrete placement and quantities are recorded against the sections and the pay items.
- Test the materialsConcrete cylinders are tested and checked against the specified strength for acceptance.
- Load testThe bi-directional test is monitored and the measured side and base resistance is compared with the design.
- InspectBearings and structure are inspected at final acceptance, and the condition joins the as-built information.
See Techware on a project like yours.